The Pipeline Hydrotest Challenge: Provide filtered water to fill a remote section of 36-mile long, 8” butane pipeline, and then treat the water prior to discharge back into a river next to protected grasslands.
The Baker Hydrotest Solution: A complete water management system, including pumps to pull river water, bag filtering, jet pumping into the pipeline (including pushing a cleaning pig), flow metering to measure returning water, piping interconnects to 15 frac tanks, pumping to bag filters, carbon vessels, sampling ports, and final bag filtration prior to discharge into a river. Baker service professionals oversaw the set up and tear down, as well as 24/7 equipment watch during pipeline filling, pressurization, and filtration of the water.